Hollow glass dew point meter <Usage method>-华强电子网

Probe domestic switch needle KG-300K needle head diameter is 3.0mm normally open switch needle
MOS power IC full range
KKST patch plug-in active passive crystal oscillator hot sale 24.576000MHZ

Insulating glass dew point meter

About parameter setting

1,

Time parameter setting

Press >

”

Key, time display, the lower row of the tube of the instrument is shining, press

”

∧

”

The key can be modified. (the meter unit time is seconds)

2,

Temperature parameter setting

Since all the parameter settings, PID setting and control parameters of the "temperature control instrument" of the equipment before leaving the factory are adjusted, do not change. Just press on the temperature control meter

"∧

”

,

"

∨

”

The “Set Temperature” (SV) can be modified by pressing the button.

3. For other parameter settings of “Timer Meter” and “Temperature Control Instrument”, please refer to the instrument manual.

Insulating glass dew point meter

Instructions

1

Connect the power cord plug, turn on the “Power” switch on the control panel, power on the “Cooling Temperature” table and the “Test Temperature” table and the “Timer” table. The system is powered normally. The "test temperature" PV shows the current "cold probe" temperature.

2. Set the temperature of the "test temperature" SV according to the experimental standard, press "Start"

”

Button, the indicator light is on, the system delay starts, and the work starts.

.

(Note: Because the equipment is a cascade refrigeration technology, this is the first-stage compression system startup work. After about 7 minutes, the secondary compression system starts automatically. The “temperature control instrument” PV on the control panel shows the cooling. Is the normal process requirements, don't worry!)

3. When the temperature reaches the “set temperature”, start the experiment, press the chronograph button switch, and start timing according to the set time. After the time arrives, the alarm light will be on. Continue to the next experiment.

4. After the test is finished, press "Start"

”

Button, the indicator light off the system stops working. Then turn off the power switch and turn off the power.

Insulating glass dew point meter

Precautions

1,

This equipment uses a compressor refrigeration process. It should be placed at rest for more than 4 hours before using the equipment for the first time. The time between starting the system twice should be no less than 30 minutes!

2,

When operating the equipment, be careful of frostbite due to the low temperature of the "cold probe"!

Non-professional professionals are not allowed to disassemble the equipment. In order to avoid danger or damage to the equipment!

Alarm Cables

Alarm Cables


  • Designed in a variety of structures from 12 AWG to 22 AWG , shielded type and unshielded type .
  • Cables are available from 2 cores to 20 cores, stranded and solid, conductor can be bare copper or tinned copper.
  • Support different applications and environments include security systems, alarm systems, power-limited control circuits systems,etc.

Alarm Cables,Cable For Fire Retardant,Cable For Fire Alarm Circuit,Alarm Security Cable

CHANGZHOU LESEN ELECTRONICS TECHNOLOGY CO.,LTD , https://www.china-lesencable.com