Two major scheme designs for shortening the maintenance time period of the unified backup automobile production line

Unified backup of the system data of the production line, shorten the maintenance cycle.

Two major scheme designs for shortening the maintenance time period of the unified backup automobile production line

Solution 1 After using GOT's backup/restore function, the system can be easily restored without a PC


After the program of the field device is backed up to the GOT in advance, when the programmable controller CPU is replaced due to an abnormality, the computer can be easily restored without using a computer.
After backing up the program and parameters of the field device to the memory card of the GOT in advance, if the programmable controller CPU fails or the battery runs out, you can easily replace and restore without using a computer.
Just specify the day of the week and time, and the system data can be automatically backed up on a regular basis.

Two major scheme designs for shortening the maintenance time period of the unified backup automobile production line

Solution 2 provides a sample screen of the backup/restore function


You can use the backup/restore function GOT sample screen that can be downloaded from our website to shorten the on-site system restoration work hours.
Solution 3 Utilize the integrated engineering tool to back up all system data in a unified way. In the company's integrated engineering environment "MELSOFT iQ Works", it is possible to back up all system data in a unified way by constructing a production line. In this way, the man-hours for preservation operations can be greatly shortened.
By using Mitsubishi Electric's integrated engineering software "MELSOFT iQ Works", the project data written in the entire production line equipment can be connected to the programmable controller CPU such as the master station via a cable via the network, and it can be read in a unified manner.
After connecting cables to each device, there is no need to use special tools to read data, which can eliminate operation errors and missing backups caused by equipment expansion and machine additions, and greatly reduce backup man-hours.

Two major scheme designs for shortening the maintenance time period of the unified backup automobile production line

System configuration example

Two major scheme designs for shortening the maintenance time period of the unified backup automobile production line

Fiber Optic Splice Box

Fibre Optic Cable Joint Box,Outdoor Fiber Splice Box,Optical Fiber Cable Joint Box,Fusion Splice Box

Ningbo Fengwei Communication Technology Co., Ltd , https://www.fengweicommunication.com